Package No. 1: Construction And Repair Of 22Kv Transmission Line From Column 01 To Column 15 Road 474E7.4, Long Vy Branch, Ben Hamlet, Ngo Khe 2, Road 477E7.4, Branch No. 1-Ccnpk, Road 472E7.4, From Column 30 To Column 55 Dt, Garment Dap Cau Branch, Thi Cau 6, Road 477E27.21, From Column 31 To Column 50 Road 475E27.21, Column 18 Dt, Column 01 Branch No. 2 Vnkb, Column 01 Branch Hl-Kb1 Route 471E27.21, At Column 29,44 Road 473E7.4, Column 9 Road Dt 478E7.4, 35Kv Line Column 55 Dt, Column 01, 05 Branches Tien Xa Highway 373E7.4, Branch No. 2-Ccnpk Highway 382E7.4: Renovating Substation Ngo Khe 2, Ve An 6, Phong Khe Pump, Thi Cau 6, Doi Ong Tu, Thi Cau 3, No. 7 Vnkb, Ve An 1, No. 2 Provincial People'S Committee, Hoa Dinh 10, No. 1, 2,3 Ly Thai To, Tran Village, Suoi Hoa Area, Suoi Hoa Apartment, Glass 2, Area 2Cd, Duong O 13, Khac Niem 6, Thi Cau 10, Dap Cau 2 – Bac Ninh