Preparation Of Detailed Project Reports For A. Const Of Cc Road From Krishnanagara Ashraya Colony To Sandur Bypass Road Ch 0.60 To 1.95 Km B. Const Of Cc Road From Laxmipura To Sandur Bypass Road Ch 0.17 To 1.20 Km C. Imp Of Road From Taranagar To Lingadahalli Ch 3.00 To 5.10 Km D. Const Of Cc Road And Bridge From Sh-49 To Siddapura Road Ch 0.00 To 0.20 Km And School Approach Is 0.15 Km Total Length 0.35 Km E. Const Of Cc Road And Drain From Bandri Chornur State Highway To Kodihalli Village Road