Continuation Of The Reconstruction Of The Building Of The Local Executive Body Of State Power Of The City Of Panjakent (Dismantling Of Floors 454 M2, Installation Of Cement Screeds 454 M2, Installation Of Laminate Flooring 454 M2, Plastering Of Walls 1713 M2, Putty Of Walls 800 M2, Installation Of Ceilings From Gypsum Cardboard 45 M2, Putty Of Walls 1247 M2, Painting Of Walls And Slopes 1743 M2, Installation Of Gypsum Cardboard Ceilings 454 M2, Painting Of Ceilings 454 M2, Removal Of Door Blocks 26 Pieces, Installation Of Door Blocks 49.1 M2, Installation Of Idomai Tamiri Binoi Makomoti Ichroiyai Mahalla Khokimiyati Davlatii Shakhri Panchakent (Barkanor Cardani Farshi Bino 454 M2, Rekhtani Farshi Betoni 454 M2, Nasbi Minced Az Laminate 454 M2, Kandani Andovai Devor 1713 M2, Kisman Andovai Devorho 800M2, Sokhtani Devor Az Plasterboard 45M2, Andovai Devor Az Gypsum 1247M2, Rank Cardani Devor 1743M2, Nasbi Arshi Bino Az Gypsum 181.6M2, Andovai Arshi Bino Az Gypsum 454M2, Rank Cardani Arshi Bino 454M2, Kandani Daru Khuchrahoi Kori 26 Adad, Nasbi Dari Khuchraho 49.1 M2, Nasbi Tachkhizoth