Signalling Work In Connection With The Engineering Works Of (1) Conversion Of 52 Kg P & C'S And Approach Rails To 60 Kg For Eliminating Junction Joints On Other Than 1St Loops Under Sr. Den S Brc (2) Surat-Vadodara - Tftr - 13.080 Tkm (3) Surat-Vadodara - Ctr (S) - 18.435 Tkm & Trr (S) - 5.710 Tkm. (4) Surat-Godhra- Ctr (P) - 7.002 Tkm On Passenger Loops (5) Surat-Godhra - Trr (P) - 20.602 Tkm