Replacing The Damaged Doors And Windows Of The Control Room, Construction Of Damaged Portion Of The Compound Wall And A Drainage Sump Near The Old Control Room, Providing Of Spiral Staircase To Terrace Floor, Casting Of New Coverslabs Over The Cable Ducts, Repairs To The Existing Gents Toilet, Providing Of Vitrified Tiles At Damaged Portion To The First Floor Of The Control House And Other Mescellaneous Works And Construction Of Office Room For Aee/Lines Room At 220Kv Ss Tekkali In Sklm Dt