The Executive Project Of Repairing And Renewing The Pool Purification Network, The Need To Carry Out The Action Is Due To The Fact That The Pool Suffered A Flood In The Basement As A Result Of Heavy Rains In November 2024. Most Of The Treatment Equipment, Chlorinators And Electricity Box Were Damaged.