Construction of rain harvesting pit, construction of ramp to arrest the flooded water, construction of new gate pillar in place of damaged old pillar, replacing the damaged old GI pipe line, providing additional rain water pipe line, providing of PCC path ways, patch PCC works and miscellaneous works at 33/11 KV Azamabad (Industrial Area) Sub Station in lines South Division of SCADA Circle.