"Selection Of A Contractor For Construction And Assembly Works (Major Overhaul) For The Site:" Bridge Over The Danube River (Danube Bridge) Between Ruse And Giurgiu On Road I-2 "Ruse-Razgrad" From Km 0+000 To Km 1+057 "