Implementation Of 694 Meters Of Transmission Line And Distribution Network, Loading, Transportation, Installation Of A 5000 Cubic Meter C.G.S-T.B.S Station And Executing Hot-Tap Operations From 12-Inch Psi With 1400 Psig With Construction Of Valve Building And Reducing Pressure And Ring Protection For Gas.