"Archaeological Studies Of 20 (Twenty) Sites In Connection With The Implementation Of The Luping From Rupcha To Vetrino To The Project" Increasing The Capacity For Transmission Of Natural Gas At A Point Of Interconnection Of Negro Water/Kardam From Bulgaria To Romania "